DEDE Net-Zero Building – Smart Climate Control for Energy Efficiency
By integrating VRV systems, IAQ sensors, and real-time feedback, DEDE’s Net-Zero Building achieved 20% energy savings, streamlined monitoring, and enhanced tenant comfort with intelligent climate control solutions.
Location
17 Rama I Rd, Rong Muang, Pathum Wan, Bangkok 10330
Property Type
Office Building
HVAC Details
VRV
Improved Performance
The building owner can now showcase the building’s energy performance through a real-time dashboard, enhancing transparency and accountability.
Reduced Report Time
Automated reporting features reduced the time spent preparing energy and performance reports.
20% Energy Savings
The intelligent climate control system optimized energy usage, leading to significant energy savings.
Client's Challenges
Limited Time for Monitoring
The building operator lacked the time to consistently monitor comfort zones, affecting the efficiency of HVAC operations.
Manual Feedback Process
Tenants had to call the operator to provide feedback on comfort, leading to delays and inefficient communication.
Ventilation Control Issues
The operator did not have enough time to manage ventilation effectively, impacting indoor air quality.
Our Solution
Integrated VRV & ERV Systems
Installed VRV (Variable Refrigerant Volume) and ERV (Energy Recovery Ventilation) systems, combined with IAQ sensors and CCTV, to automate and optimize climate control for both comfort and energy efficiency.
Intelligent Climate Control
The integrated system automatically adjusted ventilation and comfort levels based on real-time IAQ data, reducing the need for operator intervention.
Tenant Feedback via QR Code
Implemented a QR code system allowing tenants to report feedback instantly, reducing the reliance on manual calls and improving response time.
Implementation Process
1
Requirements Gathering & Project Planning
2 weeks
Worked closely with the client to understand their needs and outline the project plan.
2
Design & Development
3 months
Developed a custom smart climate control solution with real-time monitoring and control capabilities.
3
Integration & Installation
1 month
Installed sensors, HVAC controls, and the feedback system across the building.
4
Testing & Documentation
2 weeks
Conducted extensive testing to ensure all systems worked seamlessly together.
5
User Training
1 week
Trained the building operator and staff on using the new system for monitoring and managing building comfort.
DEDE Net ZERO Building x AltoTech Global
Related Cases
Mixed-use
Transforming VENCO Facility Management with Data-Driven Efficiency
VENCO improved energy efficiency, streamlined operations, and reduced manual tasks by using Alto Multi-property solution.
Government
Thai Health Promotion Foundation's Smart Dashboard
This interactive dashboard empowers users to monitor energy, waste, and carbon footprint metrics in real time, enhancing sustainability efforts across the facility.
Educational
Revolutionizing Chulalongkorn Campus Operations with AI-Powered Solutions
Chulalongkorn University, one of Thailand's premier educational institutions, embarked on a transformative journey to become a "smart campus".